Login



Muck disposal at the end of an Adit for Kaliganga-II ( this is a …
by ABHINAV
DIG040053

Muck disposal at the end of an Adit for Kaliganga-II ( this is a passage created in between the tunnel leading from Desiliting tank to Forebay with twin objective of increasing the speed of tunneling and act as bypass in case of an issue with main tunnel)

Jan, 2013 , Uttarakhand
ABHINAV , Electricity , Energy , Hydro power , Kaliganga river , Rudraprayag (D) , Uttarakhand ,
ABHINAV
DVD NO. MDVDDP032
© Copyright Centre for Science Environment 2016. All rights reserved.
© Copyright Centre for Science Environment 2016. All rights reserved.