Login



Water flowing out of the tail race and bypass stretch, which …
by ABHINAV
DIG040043

Water flowing out of the tail race and bypass stretch, which would stop flowing once the Kaliganga-II power plants is completed, as the exit of Kaliganga-I will lead directly to the tunnel of Kaliganga-II. Approximate river length affected will be around

Jan, 2013 , Uttarakhand
ABHINAV , Electricity , Energy , Hydro power , Kaliganga river , Rudraprayag (D) , Uttarakhand ,
ABHINAV
DVD NO. MDVDDP032
© Copyright Centre for Science Environment 2016. All rights reserved.
© Copyright Centre for Science Environment 2016. All rights reserved.